High definition 160d Multifunction Hydraulic Drilling Rig - JB180 Hydraulic Walking Piling Rig – Engineering Machinery

Product Features HYDRAULIC WALKING PILING RIG 1. MORE EFFECTIVE, STABLE AND DURABLE The leader, main platform and walking gear are designed for heavy-duty pile driving, to ensure more stable and effective work. Weight carrier of bigger load bearing. 2. EASY FOR ASSEMBLY AND TRANSPORATION Modular structure design, easy for assembly and disassembly. Out triggers of the platform with the rotary pin structure, is driven by cylinder, which saves trouble of disassembly. Can be disassembled and transported by parts, easy for transportation. 3. ADVANCED ELECTRO-HYDRAULIC CONTROL SYSTEM AND TECHNOLOGY Both main drum and auxiliary drum are under electro-hydraulic proportional control, available for variable speed control and lock any speed. Main pump, control valve, pressure gauge, drums are all using domestic and foreign well-known brands. 4. PRACTICAL AND RELIABLE OPERATION MONITORING SYSTEM Standard leader with goniometer and inductive load angle monitor (optional) provide instant information about batter piling and pulling force, set alarm while in danger. The previous functions can be achieved while the piling rig working with ZLD series agitating auger and sensors (optional). Deep mixing pile monitor (optional) provides data of pile depth, piling speed, the amount of slurry, and output of the information. 5. COMFORTABLE OPERATION CAB FOR EASY CONTROL Well insulated operator’s room with five wind shields assures bright, quiet environment with minimum fatigue. Hydraulic actuated winch control levers allow well performance and easy control. Space for drill control box, inductive load angle monitor (optional), deep mixing monitor (optional) is reserved in the operator’s room, make the single-driver control easy and reliable. TECHNICAL PERFORMANCE CHARACTERISTICS OF JB180 1. JB180 leader can be extended up to 60m, together with ZLD series agitating auger, it can drill holes of depth up to 53m, which is the best choice for deep foundation reinforcement and soft soil conditions. 2. Weight carrier of bigger load bearing, suitable for long Auger and vibration impact hammer, conducting large - depth filling pile operations. 3. JB180 contains 8 lifting cylinders, increase site adaptability. 4. Unique positioning structure design guarantees a self-erect without help of service crane. JB180 can make 60m height. 5. JB180 was granted complete intellectual property rights and 6 patents, including 3 patents for invention and 3 patents for utility. 6. Customizable large operator room of JB180 can install air condition (optional), more humanization configuration. Product Model: JB180 Specifications
Item JB180 HydraulicWalking Piling Rig
Total length of leader (m) 21~60
Diameter of leader (mm) Ø1220
Center distance between leader and mounted equipment (mm) 600×ø102
Leader inclination angle (left to right) (°) ±1.5
Backstay stroke (mm) 3400
Leader trimming cylinder stroke (mm) 400
Max. auger model ZLD220/85-3-M2-CS
Max. diesel hammer model D180
Max. leader length (m) 60
Max. pulling force (with Max. leader) (KN) 800
Hydraulic winch (for mounting auger, diesel hammer) Pulling force of single rope (KN) 100max
Winding and rewinding peed (m/min) 0~21
Rope diameter (mm) ø22
Drum capacity (m) 835
Hydraulic winch (for uplift, drilling pipe, pile) Pulling force of single rope (KN) 110max
Winding and rewinding peed (m/min) 0~20
Rope diameter (mm) ø22
Drum capacity (m) 300
Swing angle (°) ±10
Transverse travel Travel speed (m/min) ≤3.4
Travel step (mm) 3100
Vertical travel Travel speed (m/min) ≤ 1.3
Travel step (mm) 800
Uplift of the track Speed (m/min) ≤ 0.44
Height (mm) 500
Distance between tracks Working (mm) 9400
Travelling (mm) 6000
Distance between pulleys in track Working (mm) 6000
Travelling (mm) 5000
Transverse-moving track Length (mm) 10800
Width (mm) 1800/1200
Vertical-moving track Length (mm) 6900
Width (mm) 1700
Connection between outrigger beam and platform Pin rotary, cylinder expanding
Average ground pressure (MPA) ≤0.1
Motor power (kw) 45
Hydraulic crowded system (MPA) 25/20
Hydraulic crowded system operation Manual & electric control
Total weight of piling rig (T) ≈195
Note: Specifications are subjected to change without prior notice. Application BEILUN NINGBO PORT PROJECT   Product: Diesel Pile Hammer & JB180 / THE GATE OF THE ORIENT, SUZHOU    Product: ZLD220 & JB180 / GUANGZHOU METRO PROJECT     Product: ZLD330&JB180 Service 1. FREE-CALL CENTER SERVICE We provide free-call center service for 24hours. For further information of SEMW products or after-sale service, please call us at+0086-21-4008881749. We will provide information or solutions you need. 2. CONSULTANCY & SOLUTIONS Our professional team offers free consulting services according to different job sites, soil conditions and your requirements. 3. TESTING & TRAINING SEMW is committed to free guidance of installation and testing, to make sure that you can make proper operations. We will offer training on site if it is necessary, to make sure you know the correct way for maintenance, analysis and debugging of the malfunctions. 4. MAINTENANCE & REPAIR We have offices in many places in China, easy for maintenance. Sufficient supplies for spare parts and wearing parts. Our service team has a wide range of professional experience on any size project large or small. They provide best solutions with quick response. 5. CUSTOMERS & CONNECTIONS After-sale customer file was set up for better understanding your need and feedback. More services are provided, such as, sending info of new released products, latest technology. We also provide special offer for you. THE GLOBAL MARKETING NETWORK Diesel Hammers are the key product of SEMW. They have achieved a good reputation domestically and overseas. SEMW diesel hammers are exported in a large quantity to Europe, Russia, Southeast Asia, North America, South America, and Africa.